Building of A New Energy Source in ArcelorMittal Ostrava
Retrofit of the Existing Desulphurization and Reconstruction of the Stack for Waste Gases in the Opatovice Power Station
Ecological Improvement of the Boilers K2, K3, K4 in the Třebovice Power Plant
Reduction of Emissions of Solid Pollutants, NOx and SO2 on the Boiler K14, Heating Plant E3
Natural Gas and Oxygen Supply from the Mixing Station at the Blast Furnace Canteen to the Foundry Blast Furnace No. 2
Desulphurization of Waste Gases of the 660MW Block in the Ledvice Power Station
Replacement of Existing Electro Separators in the Opatovice Power Station
Reduction of Emission of Solid Pollutants, NOx and SO2 on the Boiler K14, E3 Heating Plant
Emergency of the Industrial Water Main DN800 in ArcelorMittal Ostrava,Plant 17 – Válcovny plechu FM (Plate Rolling Mill in Frýdek-Místek)
Reduction of Fungicide Emissions from the Foundry, Blast Furnace No. 2