Emergency of the Industrial Water Main DN800 in ArcelorMittal Ostrava,Plant 17 – Válcovny plechu FM (Plate Rolling Mill in Frýdek-Místek)

Want create site? Find Free WordPress Themes and plugins.

This was not a new building but maintenance  works in form of liquidation  of the emergency occurred on the existing steel piping of industrial water DN 800 in accordance with the building execution documentation (DPS), i.e. installation of a  new pipe section with a shut-off valve DN 600 PN10 on the existing steel pipe DN 800 behind the industrial water branch pipe DN 300 in the direction to the gatehouse of the Cold Rolling Mill in ArcelorMittal Ostrava s.r.o., Plant 17 – Válcovny plechu FM (Plate Rolling Mill in Frýdek-Místek).

The building was completed in accordance with terms and conditions defined in the previous building execution documentation phase.

CLIENT: ArcelorMittal Ostrava a.s
PROJECT IMPLEMENTATION: 2015

WORK SCOPE:

  • As-built documentation.
Did you find apk for android? You can find new Free Android Games and apps.