Assessment of the Surface Finish Workplace
A subject of the feasibility study was the building of a new workplace for surface finish of rail vehicles, and unfinished vehicle bodies. A suggested building capacity 120 pcs of rail vehicles per year. The building consisted of a part of the painting box, blasting box and preparation units for pretreatment of vehicle body surface including a project technological part and technical units /compressor plant, paints preparation unit, offices, and sanitary equipment. Rough ground shaping of the construction site : built-up area 2,517 m2, built-round area 34,500 m3. Estimated investment cost – CZK 90-100 mil. Excl. VAT.
CLIENT: | ŠKODA VAGONKA a.s. |
PROJECT IMPLEMENTATION | 2016 – 2017 |
WORK SCOPE:
- The Environment Impacts Assessment (EIA) including engineering, completion of the Noise Study, Dispersion Study, health risks assessment.