Completion of the Main Cycle Track Ostrava – Beskydy – Vratimov – Sviadnov Section

The cycle track is connected to existing sections in Vratimov and Sviadnov. The suggested track length is 8 km, width 3 m; new road, traffic signs, rest zones, and other related equipment.

CLIENT: Region of Silesian Gate, group of municipalities
PROJECT IMPLEMENTATION: 2010

WORK SCOPE:

Feasibility Study and technical study, Environment Impact Assessment documentation  (EIA), planning permit documentation including an alternative route design, building permit documentation, and application for a grant to be allocated from the Regional Operation Program


Railway Cargo Ostrava Mošnov

CLIENT: HB REAVIS a.s.
KANIA, a.s.
PROJECT IMPLEMENTATION: 2010, 2012

Obrázek16

WORK SCOPE:

Planning permit documentation and completion of a building permit documentation for Phase 1 for a container terminal, Logistic Halls 1, 2, hall comprising cranes, rail tracks  B, C and D, road logistic halls, parking and pavements, access, service and supply roads, engineering networks, fencing, final shaping and gardening, protective measures, and other building works and process equipments needed for operation of individual logistic warehouse parts.


Building of the Car Assembly Hall for Hyundai H, Nošovice Hyundai Project

CLIENT: Hyundai Motor Manufacturing Czech, s.r.o.
Takenaka Europe GmbH
PROJECT IMPLEMENTATION: 2006 – 2010

Obrázek14

WORK SCOPE:

A general designer of the design documentation for the building of a car assembly hall including transport connection, bridge, parking areas, lay-by zones, pavements, outdoor engineering networks and  infrastructure, coordination of a whole plant building development.

Planning permit documentation;

Building permit documentation;

Execution documentation.


Extended Místecká Road in Ostrava

KLIENT: Municipality of Ostrava
REALIZACE PROJEKTU: 1997

WORK SCOPE:

  • Planning permit documentation for specified road and bridge constructions.

Transport Terminal Hranečník

CLIENT: Dopravní podnik Ostrava, a.s.
PROJECT IMPLEMENTATION: 2004, 2009

Obrázek11

WORK SCOPE:

This covers the building of a transport  terminal at the area bordered by the Těšínská, Počáteční roads, and tramway route of Dopravní podnik Ostrava. We prepared a design documentation for a building permit for building works Vozovka – main routes, Tramway route (substructure), Tramway route  (superstructure), Relaying of traction columns, Traction column trolleybus line, and process equipments  SSZ of the crossing of Těšínská x Počáteční roads.


I/57 Semetín – Bystřička, 2nd Building – Completion of a Design Documentation of the Playground Relocation

CLIENT: Directorate of Roads and Highways of the Czech Republic, Zlín Business Unit
PROJECT IMPLEMENTATION: 2010

Obrázek9

WORK SCOPE:

Completion of a planning permit documentation for the building work SO 750 Relocation of the Football Playground . This covered building of a new playground including backgrounds that will be liquidated due to building of the building work SO 101 Relaying of Road  I/57  in km approx.  6.700, and estimation of building cost. A new football playground site is a part of the locality development plan of the municipality of Jablůnka – a respective architectonic study was completed.


Subway under I./11 in Bystřice nad Olší

CLIENT: Municipality of Bystřice  nad Olší
PROJECT IMPLEMENTATION: 2003

WORK SCOPE:

Completion of a single phase planning and building permit documentation including site and altimetric layout. It covers a subway for pedestrians and cyclists including related pavements, supporting walls and modification in the earth body.