Natural Gas and Oxygen Supply from the Mixing Station at the Blast Furnace Canteen to the Foundry Blast Furnace No. 2

Want create site? Find Free WordPress Themes and plugins.

A key subject of the action was to prepare a design documentation for execution of  new natural gas and oxygen connection pipes at the area of the company ArcelorMittal Ostrava. A subject of the design documentation is  new natural gas and oxygen supply from the mixing station at the blast furnace to the foundry blast furnace number 2. The newly supplied media will serve us in putting into operation a new (oxygen-fuel) torch igniter of the blast furnace No. 2 which installed input is  3.5 MW.

The particularly designed documentation consists of the natural gas and oxygen inlet piping, and the design of the control line of natural gas and oxygen for the torch igniter of the blast furnace number 2. The total length of the installed piping is 70 m.

CLIENT: ArcelorMittal Ostrava a.s.
PROJECT IMPLEMENTATION: 2015

WORK SCOPE:

  • Building execution documentation.
Did you find apk for android? You can find new Free Android Games and apps.